You may be trying to access this site from a secured browser on the server. Please enable scripts and reload this page.
Turn on more accessible mode
Turn off more accessible mode
Skip Ribbon Commands
Skip to main content
To navigate through the Ribbon, use standard browser navigation keys. To skip between groups, use Ctrl+LEFT or Ctrl+RIGHT. To jump to the first Ribbon tab use Ctrl+[. To jump to the last selected command use Ctrl+]. To activate a command, use Enter.
Site Actions
This page location is:
BCPS
SAB
BCPS Administration SharePoint Home Site
Safety Drills
BCHS
Browse
Tab 1 of 2.
View
Tab 2 of 2.
Sign In
Edit
Item
Version History
Manage Permissions
Delete Item
Manage
BCPS Administration SharePoint Home Site
Safety Drills
:
BCHS
Top Link Bar
Home
Currently selected
Quick Launch
Documents
docs
Reports and Communications
site
Site Pages
Pictures
Lists
Safety Drills
School Volunteer List
Safety Drills Superintendent Review
Discussions
Surveys
All Site Content
Version History
School
BCHS
Drill Type
Fire
Start Time
8/27/2013 2:30 PM
Staged Variables
None
Weather Conditions
Clear
Temperature
80+
Alarm
Operational; Audible Throughout; Different Than Class Bell; Inspected Within 365 Days
Corridors
Unobstructed; Well-lighted; Emergency Lights Working (Halls, Gym, Auditorium)
Exits
Unlocked; Unobstructed; Marked with Signs; Lighted Signs; Doors Functional; Door Hardware Functional
Number of Participants
295
Others in Attendance
SRO
All room windows and doors were locked.
Yes
All room lights turned off
Yes
"Evacuation Plan" route was followed by all students?
Yes
Student exit path did not interfere with arriving emergency vehicles?
Yes
Exit Drill: Seconds to Evacuate
100-109
Lockdown: Seconds to Clear Hallways
N/A
Lockdown: Students could not be seen or heard from hallway or window.
N/A
All students performed the drill properly
Yes
All staff performed the drill properly
Yes
Strengths
Rick Bolling
(
3/11/2014 9:02 PM
): Comment noted.
Sarah Rowe
(
3/10/2014 11:09 AM
): Time was reduced to complete the drill
Sarah Rowe
(
3/10/2014 11:05 AM
): Time was reduced to complete the drill
Areas for Improvement
Rick Bolling
(
3/11/2014 9:02 PM
): Comment noted.
Sarah Rowe
(
3/10/2014 11:09 AM
): Use obstructed drills in the future.
Sarah Rowe
(
3/10/2014 11:05 AM
): Use obstructed drills in the future.
Principal Approval
Yes
Approval Status
Approved
Attachments
Version: 3.0
Created at 3/10/2014 11:05 AM by Sarah Rowe
Last modified at 3/11/2014 9:02 PM by Rick Bolling